Anthony And Gordon Construction
Company, Inc.

CAGE Code: 1UA46

NCAGE Code: 1UA46

Status: Active

Type: Commercial Supplier

Dun & Bradstreet (DUNS): 802692350

Summary

Anthony And Gordon Construction, Company, Inc. is an Active Commercial Supplier with the Cage Code 1UA46 and is tracked by Dun & Bradstreet under DUNS Number 802692350..

Address

110 Raleigh Road
Oak Ridge TN 37830-5025
United States

Points of Contact

Telephone:
8655461776
Fax:
8655461454

Related Information

Associated CAGE Codes People who viewed this 'CAGE Code' also viewed...

CAGE Code FAQ Frequently Asked Questions (FAQ) for CAGE 1UA46

What is CAGE Code 1UA46?
1UA46 is the unique identifier used by NATO Organizations to reference the physical entity known as Anthony And Gordon Construction Company, Inc. located at 110 Raleigh Road, Oak Ridge TN 37830-5025, United States.
Who is CAGE Code 1UA46?
1UA46 refers to Anthony And Gordon Construction Company, Inc. located at 110 Raleigh Road, Oak Ridge TN 37830-5025, United States.
Where is CAGE Code 1UA46 Located?
CAGE Code 1UA46 is located in Oak Ridge, TN, USA.

Contracting History for CAGE 1UA46 Contracting History for CAGE 1UA46 Most Recent 25 Records

N6945013C0756
Igf::Ot::Igf Aircraft Corrosion Control Facility
8 Mar 2017
Navfac Southeast
Department Of Defense (Dod)
$17,441,652.35
N6945013C0756
Igf::Ot::Igf Aircraft Corrossion Control Facility
30 Sep 2018
Navfac Southeast
Department Of Defense (Dod)
$17,441,652.35
DOLETA15C0086
Igf::Ct::Igf Rfc #34- Addition For Stairway Footings Add: 3,368 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
9 Aug 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
0001
Design And Construction Bldgs
1 Apr 2020
Us Army Engineer District Charlesto
Department Of Defense (Dod)
$6,428,823.39
N6945013C0754
Negotiated Settlement Agreement
24 Aug 2022
Navfac Southeast
Department Of Defense (Dod)
$13,300,096.10
DOLETA15C0086
Igf::Ct::Igf Rfc No. 24 Incorporates Additional Services To The Shreveport Jcc Project. Add: 52 Calendar Days The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
22 Feb 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Modification 0021 Corrects The Overall Contract Price, As Appropriate. Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
27 Sep 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Rfc No.0020 And 0021 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
27 Jul 2017
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Rfc No. 25 Add Door Vision Panels At Building A - Shreveport Jcc Project. Deduct: $532 Rfc No. 26 - Rerouting Of Water Lines Add: $32,155 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
7 Mar 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
N6945013C0754
Igf::Ot::Igf - Install Type J Light Fixtures In Room 133
21 Mar 2017
Navfac Southeast
Department Of Defense (Dod)
$11,169,185.77
DOLETA15C0086
Igf::Ct::Igf Rfc No.0013,0014,0015, 0016, And 0017 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
23 Jun 2017
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
W9126G13C0005
De-Obligate Funds Remaining After Final Payment For Vehicle Maintenance Facility At Fort Sam Houston
1 Feb 2019
Us Army Engineer District Ft Worth
Department Of Defense (Dod)
$13,964,859.00
N6945013C0756
Igf::Ot::Igf Aircraft Corrosion Control Facility
17 Aug 2017
Navfac Southeast
Department Of Defense (Dod)
$17,441,652.35
N6945013C0756
Igf::Ot::Igf Aircraft Corrossion Control Facility
12 Dec 2018
Navfac Southeast
Department Of Defense (Dod)
$17,441,652.35
DOLETA15C0086
Igf::Ct::Igf Rfc No. 28 - Deleting Knee Walls At Canopy B Deduct: $6,264 Subsequently, The Government Realizes A Credit Of $6,264. Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. Rfc No. 30 - Storm Drain Piping And Boxes Add: $19,121 Add: 0 Calendar Days Rfc No. 29 - Storm Drain Piping And Boxes Add: $12,857 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
19 Jul 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Rfc No.0011 And 0012 Incorporates Additional Services To The Shreveport Jcc Project. Add: $5,954 Add: 0 Calendar Days Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged.
19 Jun 2017
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Rfc #33 - Credit Of The Deletion Of Storm Drains Add: ($7,478.00) Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
12 Sep 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
N6945013C0756
Igf::Ot::Igf Aircraft Corrossion Control Facility
3 Aug 2017
Navfac Southeast
Department Of Defense (Dod)
$17,441,652.35
DOLETA15C0086
Igf::Ct::Igf Rfc No. 0023 Incorporates Additional Services To The Shreveport Jcc Project. Add: 21 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
3 Nov 2017
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Rfc #31-Furred-Out In Room 216 Add: 1,141 Rfc #32 -Modify Water Main Serving Building A Add: $3,712 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. Rfc No. 30 - Storm Drain Piping And Boxes Add: $19,121 Add: 0 Calendar Days Rfc No. 29 - Storm Drain Piping And Boxes Add: $12,857 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
3 Aug 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
0001
Design And Construction Bldgs-
10 Mar 2020
Us Army Engineer District Charlesto
Department Of Defense (Dod)
$6,428,823.39
DOLETA15C0086
Igf::Ct::Igf Rfc #35 - Remodel Space In Building D For Educational Space Renovations Add: $493,319.00 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
17 Sep 2018
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
DOLETA15C0086
Igf::Ct::Igf Rfc No.0022 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
20 Sep 2017
Dol (Eta) Ofc Of Contract Mgmt
Department Of Labor (Dol)
$15,481,726.06
N6945013C0754
Igf::Ot::Igf Anthony&Gordon Is To Add Copper Pipe And A Regulator For The Sanding Table Dust Collection System And Install A Sump Pit In The Base Of The Passenger Elevator Shaft. The Following W Ork W Ill Be De-Scoped: Relocation Of The Passenger Elevator Control Panel And Associated Electrical W Ork From Disconnects To The Control Panel.
3 Mar 2017
Navfac Southeast
Department Of Defense (Dod)
$11,169,185.77
N6945015D0607
Igf::Ot::Igf Option Year Two - One Year Time Extenstion - South Tx Med Macc
15 Jun 2018
Navfac Southeast
Department Of Defense (Dod)
$0.00