Anthony And Gordon Construction
Company, Inc.
CAGE Code: 1UA46
NCAGE Code: 1UA46
Status: Active
Type: Commercial Supplier
Dun & Bradstreet (DUNS): 802692350
Summary
Anthony And Gordon Construction, Company, Inc. is an Active Commercial Supplier with the Cage Code 1UA46 and is tracked by Dun & Bradstreet under DUNS Number 802692350..
Address
110 Raleigh Road
Oak Ridge TN 37830-5025
United States
Points of Contact
- Telephone:
- 8655461776
- Fax:
- 8655461454
Related Information
People who viewed this 'CAGE Code' also viewed...
Select Corporate Meetings Inc Apex Office Supply And Design Scientific Sales Inc Tennessee Tape And Label Corp Webster Engineering And Machining Diversified Engineering Inc Automated Sciences Group Inc Mark Iii Machining Industrial Hardware And Supply Inc Apex Office Design, Inc. Iso-Clear Systems Corp Ampex Corp Honeywell Federal Systems Wilson M K & Associates Inc Eclectech Inc Waste Abatement Technology Llc General Metal Supply Eastern Technical Engineering Corp Analysas Corp Southeast Enterprises Of Oakridge
Frequently Asked Questions (FAQ) for CAGE 1UA46
- What is CAGE Code 1UA46?
- 1UA46 is the unique identifier used by NATO Organizations to reference the physical entity known as Anthony And Gordon Construction Company, Inc. located at 110 Raleigh Road, Oak Ridge TN 37830-5025, United States.
- Who is CAGE Code 1UA46?
- 1UA46 refers to Anthony And Gordon Construction Company, Inc. located at 110 Raleigh Road, Oak Ridge TN 37830-5025, United States.
- Where is CAGE Code 1UA46 Located?
- CAGE Code 1UA46 is located in Oak Ridge, TN, USA.
Contracting History for CAGE 1UA46 Most Recent 25 Records
- N6945013C0756
- Igf::Ot::Igf Aircraft Corrosion Control Facility
- 8 Mar 2017
- Igf::Ot::Igf Aircraft Corrosion Control Facility
- Navfac Southeast
- Department Of Defense (Dod)
- $17,441,652.35
- Department Of Defense (Dod)
- N6945013C0756
- Igf::Ot::Igf Aircraft Corrossion Control Facility
- 30 Sep 2018
- Igf::Ot::Igf Aircraft Corrossion Control Facility
- Navfac Southeast
- Department Of Defense (Dod)
- $17,441,652.35
- Department Of Defense (Dod)
- DOLETA15C0086
- Igf::Ct::Igf Rfc #34- Addition For Stairway Footings Add: 3,368 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 9 Aug 2018
- Igf::Ct::Igf Rfc #34- Addition For Stairway Footings Add: 3,368 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- 0001
- Design And Construction Bldgs
- 1 Apr 2020
- Design And Construction Bldgs
- Us Army Engineer District Charlesto
- Department Of Defense (Dod)
- $6,428,823.39
- Department Of Defense (Dod)
- N6945013C0754
- Negotiated Settlement Agreement
- 24 Aug 2022
- Negotiated Settlement Agreement
- Navfac Southeast
- Department Of Defense (Dod)
- $13,300,096.10
- Department Of Defense (Dod)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No. 24 Incorporates Additional Services To The Shreveport Jcc Project. Add: 52 Calendar Days The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 22 Feb 2018
- Igf::Ct::Igf Rfc No. 24 Incorporates Additional Services To The Shreveport Jcc Project. Add: 52 Calendar Days The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Modification 0021 Corrects The Overall Contract Price, As Appropriate. Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 27 Sep 2018
- Igf::Ct::Igf Modification 0021 Corrects The Overall Contract Price, As Appropriate. Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No.0020 And 0021 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 27 Jul 2017
- Igf::Ct::Igf Rfc No.0020 And 0021 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No. 25 Add Door Vision Panels At Building A - Shreveport Jcc Project. Deduct: $532 Rfc No. 26 - Rerouting Of Water Lines Add: $32,155 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 7 Mar 2018
- Igf::Ct::Igf Rfc No. 25 Add Door Vision Panels At Building A - Shreveport Jcc Project. Deduct: $532 Rfc No. 26 - Rerouting Of Water Lines Add: $32,155 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- N6945013C0754
- Igf::Ot::Igf - Install Type J Light Fixtures In Room 133
- 21 Mar 2017
- Igf::Ot::Igf - Install Type J Light Fixtures In Room 133
- Navfac Southeast
- Department Of Defense (Dod)
- $11,169,185.77
- Department Of Defense (Dod)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No.0013,0014,0015, 0016, And 0017 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 23 Jun 2017
- Igf::Ct::Igf Rfc No.0013,0014,0015, 0016, And 0017 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- W9126G13C0005
- De-Obligate Funds Remaining After Final Payment For Vehicle Maintenance Facility At Fort Sam Houston
- 1 Feb 2019
- De-Obligate Funds Remaining After Final Payment For Vehicle Maintenance Facility At Fort Sam Houston
- Us Army Engineer District Ft Worth
- Department Of Defense (Dod)
- $13,964,859.00
- Department Of Defense (Dod)
- N6945013C0756
- Igf::Ot::Igf Aircraft Corrosion Control Facility
- 17 Aug 2017
- Igf::Ot::Igf Aircraft Corrosion Control Facility
- Navfac Southeast
- Department Of Defense (Dod)
- $17,441,652.35
- Department Of Defense (Dod)
- N6945013C0756
- Igf::Ot::Igf Aircraft Corrossion Control Facility
- 12 Dec 2018
- Igf::Ot::Igf Aircraft Corrossion Control Facility
- Navfac Southeast
- Department Of Defense (Dod)
- $17,441,652.35
- Department Of Defense (Dod)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No. 28 - Deleting Knee Walls At Canopy B Deduct: $6,264 Subsequently, The Government Realizes A Credit Of $6,264. Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. Rfc No. 30 - Storm Drain Piping And Boxes Add: $19,121 Add: 0 Calendar Days Rfc No. 29 - Storm Drain Piping And Boxes Add: $12,857 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 19 Jul 2018
- Igf::Ct::Igf Rfc No. 28 - Deleting Knee Walls At Canopy B Deduct: $6,264 Subsequently, The Government Realizes A Credit Of $6,264. Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. Rfc No. 30 - Storm Drain Piping And Boxes Add: $19,121 Add: 0 Calendar Days Rfc No. 29 - Storm Drain Piping And Boxes Add: $12,857 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No.0011 And 0012 Incorporates Additional Services To The Shreveport Jcc Project. Add: $5,954 Add: 0 Calendar Days Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged.
- 19 Jun 2017
- Igf::Ct::Igf Rfc No.0011 And 0012 Incorporates Additional Services To The Shreveport Jcc Project. Add: $5,954 Add: 0 Calendar Days Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged.
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Rfc #33 - Credit Of The Deletion Of Storm Drains Add: ($7,478.00) Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 12 Sep 2018
- Igf::Ct::Igf Rfc #33 - Credit Of The Deletion Of Storm Drains Add: ($7,478.00) Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- N6945013C0756
- Igf::Ot::Igf Aircraft Corrossion Control Facility
- 3 Aug 2017
- Igf::Ot::Igf Aircraft Corrossion Control Facility
- Navfac Southeast
- Department Of Defense (Dod)
- $17,441,652.35
- Department Of Defense (Dod)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No. 0023 Incorporates Additional Services To The Shreveport Jcc Project. Add: 21 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 3 Nov 2017
- Igf::Ct::Igf Rfc No. 0023 Incorporates Additional Services To The Shreveport Jcc Project. Add: 21 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Rfc #31-Furred-Out In Room 216 Add: 1,141 Rfc #32 -Modify Water Main Serving Building A Add: $3,712 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. Rfc No. 30 - Storm Drain Piping And Boxes Add: $19,121 Add: 0 Calendar Days Rfc No. 29 - Storm Drain Piping And Boxes Add: $12,857 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 3 Aug 2018
- Igf::Ct::Igf Rfc #31-Furred-Out In Room 216 Add: 1,141 Rfc #32 -Modify Water Main Serving Building A Add: $3,712 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. Rfc No. 30 - Storm Drain Piping And Boxes Add: $19,121 Add: 0 Calendar Days Rfc No. 29 - Storm Drain Piping And Boxes Add: $12,857 The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- 0001
- Design And Construction Bldgs-
- 10 Mar 2020
- Design And Construction Bldgs-
- Us Army Engineer District Charlesto
- Department Of Defense (Dod)
- $6,428,823.39
- Department Of Defense (Dod)
- DOLETA15C0086
- Igf::Ct::Igf Rfc #35 - Remodel Space In Building D For Educational Space Renovations Add: $493,319.00 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 17 Sep 2018
- Igf::Ct::Igf Rfc #35 - Remodel Space In Building D For Educational Space Renovations Add: $493,319.00 Other Than This Change, All Other Terms And Conditions Of The Contract Remain Unchanged. The Substantial Completion Date For Phase B Is Changed From 08/10/2018 To 10/01/2018. The Substantial Completion Date For Phase C Is Changed From 03/11/2019 To 05/02/2019. The Final Period Of Performance Is Changed From 05/13/2019 To 07/04/2019. Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- DOLETA15C0086
- Igf::Ct::Igf Rfc No.0022 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- 20 Sep 2017
- Igf::Ct::Igf Rfc No.0022 Incorporates Additional Services To The Shreveport Jcc Project. Add: 0 Calendar Days Add: $7,008 Other Than The Changes Made Herein All Other Terms And Conditions Of The Contract Remain Unchanged. 111
- Dol (Eta) Ofc Of Contract Mgmt
- Department Of Labor (Dol)
- $15,481,726.06
- Department Of Labor (Dol)
- N6945013C0754
- Igf::Ot::Igf Anthony&Gordon Is To Add Copper Pipe And A Regulator For The Sanding Table Dust Collection System And Install A Sump Pit In The Base Of The Passenger Elevator Shaft. The Following W Ork W Ill Be De-Scoped: Relocation Of The Passenger Elevator Control Panel And Associated Electrical W Ork From Disconnects To The Control Panel.
- 3 Mar 2017
- Igf::Ot::Igf Anthony&Gordon Is To Add Copper Pipe And A Regulator For The Sanding Table Dust Collection System And Install A Sump Pit In The Base Of The Passenger Elevator Shaft. The Following W Ork W Ill Be De-Scoped: Relocation Of The Passenger Elevator Control Panel And Associated Electrical W Ork From Disconnects To The Control Panel.
- Navfac Southeast
- Department Of Defense (Dod)
- $11,169,185.77
- Department Of Defense (Dod)
- N6945015D0607
- Igf::Ot::Igf Option Year Two - One Year Time Extenstion - South Tx Med Macc
- 15 Jun 2018
- Igf::Ot::Igf Option Year Two - One Year Time Extenstion - South Tx Med Macc
- Navfac Southeast
- Department Of Defense (Dod)
- $0.00
- Department Of Defense (Dod)